14
USING LEFT AND RIGHT-HAND MODELS
TO MAKE A V-RAKE
1. Install the Tool Bar Frame (1) to the tractor 3-point linkage using a forklift or crane. Raise the frame with tractor's
hydraulics. (See Illustration 13).
2. Install the 3-Point Upper and Lower Linkage (9 & 11) on the frame. Do not tighten bolts until all components are in
place and rakes are installed so minor adjustments can be made.
3. Install the assembled left and right rakes to the toolbar frame.
The working width of the V-Rake and the width of the windrow can be changed by moving the 3-Point Upper and Lower
Linkage (9 & 11) horizontally on the tool bar frame.
V-Rake in Operation
Illustration 13
Location for SMV Sign
Illustration 14
IMPORTANT: Safety reflectors have bee installed on the ends of the Tool Bar Frame to warn approaching traffic of a
potential hazard. Make sure reflectors are clean and in good condition at all times. Replace damaged or missing
reflectors immediately.
Komentáře k této Příručce